Trail Ridge Road
Trail Ridge Road crosses Rocky Mountain National Park between Estes Park and Grand Lake and climbs above 12,000 feet. It closes for the winter and can shut at short notice.
- State
- Colorado (Rocky Mountain National Park)
- Length
- 48 miles
- Start / end
- Estes Park – Grand Lake
- Top elevation
- 12,183 ft
- Best season
- Summer to early autumn
What should you know before visiting Trail Ridge Road?
No toll roads expected for a car. Mountain passes: Trail Ridge Road (3,713 m, usually open June–September).
- The road usually closes in mid-October and usually reopens in the last week of May, weather permitting. Temporary closures can happen at any time.
- About 11 miles run above 11,500 ft, with few guardrails and no shoulders. Winter brings drifting snow, high winds and freezing temperatures above 10,000 ft, so pack warm layers.
- In 2026, entering the park between 9 a.m. and 2 p.m. needed a timed entry reservation from late May to mid-October. This is the option for a Trail Ridge Road drive. Check the park's page, as rules change.
The drive
The paved road is 48 miles long and links Estes Park on the east side with Grand Lake on the west side. Its high point is 12,183 ft, and the park calls it the highest continuous paved road in the United States. The Alpine Visitor Center at Fall River Pass stands at 11,796 ft. Allow 1.5 to 2 hours one way in steady traffic, more with stops at Rainbow Curve and other pullouts. Elk, mule deer, bighorn sheep and marmots are often on or beside the road.
Planning
The park publishes a 24-hour recorded status line for the road, and variable message signs stand along it. When the Colorado traction law is active, vehicles need properly rated tires with enough tread or an approved traction device. The park pages checked list no length or weight limit for Trail Ridge Road itself. Old Fall River Road, a separate unpaved one-way road, bans vehicles over 25 ft and those towing trailers. Check the National Park Service pages for campgrounds and fuel.
FAQs
When is Trail Ridge Road open?
It usually closes to through traffic in mid-October and usually reopens in the last week of May. Dates depend on snow and weather, and closures can come at short notice. Check the park's road status first.
Do I need a reservation to drive it?
In 2026, a timed entry reservation was required from late May to mid-October for entry between 9 a.m. and 2 p.m. The park names the standard timed entry for Trail Ridge Road drives. Entry outside those hours needed none. Check the current rules.
Can motorhomes use Trail Ridge Road?
The park pages used here name no size limit for the paved road, only for Old Fall River Road. The road has no shoulders and few guardrails, so drive slowly and check the status line on the day.
Places to see
Trail Ridge Road
The highest continuous paved road in the US, topping out at 12,183 feet in Rocky Mountain National Park.…
Garden of the Gods
A free city park where red sandstone fins stand upright in front of Pikes Peak. The paved loops are easy.
Red Rocks Amphitheatre
A concert venue carved between 300-foot sandstone monoliths. Visit during the day to climb the stairs and…
Holzwarth Historic Site
A 1920s dude ranch in Rocky Mountain National Park’s Kawuneeche Valley, reached by an easy 800 m walk from…
Adams Falls
A short walk from the East Inlet trailhead at Grand Lake to a waterfall squeezed through a granite gorge.…
Rabbit Ears Pass
US-40 crosses the Continental Divide here, named after a twin rock formation visible north of the road.…
Fish Creek Falls
A 85 m waterfall a short paved walk from the parking lot, 5 km east of downtown Steamboat. Busy in summer;…
